“Green Precast Modular Systems” the world wide Pioneer of the 3D, monolithic concrete modular construction solution

ABOUT GPS&T WHY GPS&T CORPORATE RESPONSABILITIES CASE STUDIES GALLERY PRESS ROOM MEDIA CEO MESSAGE
Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
  • photos/gpst_16.jpg

  • photos/gpst_17.jpg

  • photos/gpst_18.jpg

  • photos/gpst_19.jpg

  • photos/gpst_20.jpg

  • photos/gpst_21.jpg

  • photos/gpst_22jpg

  • photos/gpst_23.jpg

  • photos/gpst_24.jpg

  • photos/gpst_25jpg

  • photos/gpst_26.jpg

  • photos/gpst_27.jpg

  • photos/gpst_28.jpg

  • photos/gpst_29.jpg

  • photos/gpst_30.jpg

  • photos/gpst_31.jpg

  • photos/gpst_32.jpg

  • photos/gpst_33.jpg

  • photos/gpst_34.jpg

  • photos/gpst_35.jpg

  • photos/gpst_36.jpg

  • photos/gpst_37.jpg

  • photos/gpst_38.jpg

  • photos/gpst_39.jpg

  • photos/gpst_40.jpg

G+1 OFFICE BLOCK

PRODCUTION AND INSTALLATION OF 1000M2 of BUA PER DAY FACILTIY