“Green Precast Modular Systems” the world wide Pioneer of the 3D, volumetric, monolithic concrete modular construction innovation since the 1980s.

Green Precast Systems, GPS 3D Modular, the World's largest 3D modular factory , established in the UAE

"The way to build today and for the future"

ABOUT GPS&T WHY GPS&T CORPORATE RESPONSABILITIES CASE STUDIES GALLERY PRESS ROOM MEDIA CEO MESSAGE
Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
WHAT MADE GREEN PRECAST THE CHOICE OF MANY NATIONS?

THE WAY TO BUILD TODAY AND FOR THE FUTURE

The Green Precast System provides a highly flexible building system that delivers strength, cost and time savings, durability, thermal and acoustic efficiencies and a structurally superior product resistant to natural disasters!


Less material and less structural joints.
Faster construction time regardless of the weather conditions.
Less detailing and shop drawings (margin for error), production accuracy.
Less pieces to install (and transport).
Dramatically reduces brackets, bolts, vertical joints to fill.
In situ fit-out and installation of windows,painting,doors can be done prior to erection.
Accurate within tolerances of +/- 2mm - 5mm.
Flexible to meet the demands of your design.
High quality, Class 1 finish.
Scaffolding NOT required.
Automated Production System.
Earthquake resistant
Fire rating +2 hours
Termite proof


Up to 80% FASTER than traditional construction methods
Up to 50% CHEAPER – material and labour savings
Up to 90% WASTE FREE – totally relocatable and recyclable
Up to 50% STRONGER each unit monolithic: one piece
(dependent upon design, time frames and project size).