Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
  • photos/gpst_01.jpg

  • photos/gpst_02.jpg

  • photos/gpst_03.jpg

  • photos/gpst_04.jpg

800M2 each Villa Project