“Green Precast Modular Systems” the world wide Pioneer of the 3D, monolithic concrete modular construction solution

ABOUT GPS&T WHY GPS&T CORPORATE RESPONSABILITIES CASE STUDIES GALLERY PRESS ROOM MEDIA CEO MESSAGE
Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
  • photos/gpst_45.jpg

  • photos/gpst_46.jpg

  • photos/gpst_47.jpg

  • photos/gpst_48.jpg

  • photos/gpst_49.jpg

  • photos/gpst_50.jpg

  • photos/gpst_51.jpg

G+4 Affordable Housing Project

Full Modular Project