“Green Precast Modular Systems” the world wide Pioneer of the 3D, monolithic concrete modular construction solution

ABOUT GPS&T WHY GPS&T CORPORATE RESPONSABILITIES CASE STUDIES GALLERY PRESS ROOM MEDIA CEO MESSAGE
Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
  • photos/gpst_05.jpg

  • photos/gpst_06.jpg

  • photos/gpst_07.jpg

  • photos/gpst_08.jpg

AFFORDABLE HOUSING VILLA - UAE