“Green Precast Modular Systems” the world wide Pioneer of the 3D, monolithic concrete modular construction solution

ABOUT GPS&T WHY GPS&T CORPORATE RESPONSABILITIES CASE STUDIES GALLERY PRESS ROOM MEDIA CEO MESSAGE
Faster, Cheaper, Stronger, Better.
Green Precast Installation of the 360m2 took 1hour and 4 workers. Our installation was compared with the site next door using conventional flat panel precast, that had 45 men working 7 hours and installed 300M2.
  • photos/gpst_52.jpg

  • photos/gpst_53.jpg

  • photos/gpst_54.jpg

  • photos/gpst_55.jpg

  • photos/gpst_56.jpg

  • photos/gpst_57.jpg

  • photos/gpst_58.jpg

  • photos/gpst_59.jpg

  • photos/gpst_60.jpg

  • photos/gpst_61.jpg

  • photos/gpst_62.jpg

GPS MODULAR SITE SET UP